Performed Installation of 5+ Miles of Water Distribution Main, Water Facility upgrades, 250k GST's, RO Units, Triplex Pump Stations, HP tanks, Automation, Feed Pumps, Chemical Injection Treatment, and all associated piping and Appurtenance in a Design Build Role.
Water Distribution, Sewer Collection, and Sewer Grinder Station.
Performed mass excavation, site work, storm drainage, water, sewer, curb and gutter, soil stabilization, asphalt paving, baseball/softball/soccer fields, growing media and fine grading, clearing and grubbing.
Clearing, grubbing, site preparation, mass excavation.
Installed 7' X 5' concrete box culvert and miscellaneous concrete drainage structures.
Performed mass excavation in Sub-title D cell expansion, tank cell conversion, and required leachate piping, pumps and force main.
Performed site preparation and storm drainage for this federally funded Davis Bacon project, requiring certified payroll on a weekly basis.
Performed mass excavation and construction of Sub-title D cell.
Extension of sewer mains and manhole additions.
Bridge replacement - replaced existing bridge with twin 96" arched pipe.
Excavation of a lake. Site work for drainage and esthetic improvements. Installation of Storm Drainage and concrete water control structures. Construction of jogging trail.
Clearing and site preparation.
Duplex sewer lift station and approximately 3 miles of sewer force main.
Rehabilitation of various lift stations and sewer mains.
Chemin Metairie Parkway turning lane.
Highway 92 turning lane.
Martial Avenue street extension.
Site preparation.
Plantation Crossing Street Extension.
Savoy Road reconstruction. Complete rebuild and widening of Savoy Road including: removal of old road and base, regrading of roadway, drainage improvements, lime and cement stabilization of base curb & gutter, asphalt paving, new sidewalks, erosion control & seeding.